Total Bathroom Reno – Roseneath Project

Doron and I took on a new challenge for friends of ours who were looking to completely redo their 100 year old bathroom, aesthetically and structurally.

We didn’t capture too many before pictures, but this photo is after phase one demolition. We removed peachy coloured wall tiles throughout the bathroom, removed toilet & pedestal sink, and even the window casing as it really dated this bathroom. The owners wanted everything new and updated.

2016-04-23-20.03.59.png.png

 

The owners chose a white subway tile to make their little washroom nook current and it made the bathroom appear larger and brighter. They also chose a mosaic mini hexagon tile for the floor. The look of the bathroom resulted in a Parisian chic atmosphere.

Here are the after shots:

Subway Tile in tub area and walls, shower head, and curtain rod installed

Window reconstructed with tile flush to window

2016-04-23-20.42.50.jpg.jpg

Vanity and toilet installed

Mosaic Floors installed

Storage space built behind tub area

IMG_0131

Finishing touches (paint, decor)

Client must add bathroom mirror of choice, and bathroom reno is complete!!

To see more of our projects, follow me on @designwithrev on Instagram!

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s